A house built in under 24 hours used to sound like science fiction. In 2026, it’s already happening on real construction sites—and not as a one-off experiment, but as a repeatable, scalable process.
The global construction industry is under pressure from every direction: rising costs, a shrinking workforce, and an unprecedented demand for housing. Traditional methods are struggling to keep up. Into that gap, 3D printing has emerged—not as a concept, but as a working solution already delivering homes, military structures, and commercial buildings across multiple countries.
3D Printing Construction Market Size and Key Statistics (2026)
The 3D printing construction market in 2026 is expanding rapidly, driven by rising construction costs, labour shortages, and the need for faster and more sustainable building methods. The following data highlights key market trends, cost advantages, and performance improvements shaping the industry.
📌 Market figures are based on cross-referenced industry reports and may vary depending on scope (hardware vs full ecosystem).
These statistics indicate that construction 3D printing is moving beyond experimental use and becoming a viable solution for modern construction challenges. As technology advances and regulations evolve, adoption is expected to accelerate significantly.
The Crisis That Created This Market
The global construction industry is in the middle of two simultaneous crises, and they’re feeding each other in a way that’s becoming impossible to ignore. The first is a severe and worsening skilled labour shortage — the US alone is short an estimated 500,000 construction workers as of 2025, while the EU faces a deficit exceeding 800,000. The second is a housing affordability emergency: the UN estimates the world needs 96,000 new homes every single day just to keep pace with population growth and urbanisation.
Traditional construction simply cannot solve both problems simultaneously. It requires too many hands, takes too long, generates too much waste, and cannot economically scale to the volume required. That’s precisely the window that 3D printing in construction — or construction-scale additive manufacturing — is moving into, and it’s doing so faster than most people in the industry expected.
This is not a future technology anymore. Houses have been printed in under 24 hours. The US military has printed operational barracks. Commercial buildings, school infrastructure, and affordable housing developments are being delivered using automated concrete extrusion systems in at least a dozen countries. The question isn’t whether construction 3D printing works — it demonstrably does. The questions now are how fast it scales, where it makes economic sense today, and what the industry looks like when it matures.
What Is 3D Printing in Construction? — The Technical Reality
Construction-scale 3D printing — formally called large-format additive manufacturing (LFAM) or contour crafting in some literature — is the automated, layer-by-layer deposition of construction material (typically a cement-based mix) to build structural and non-structural elements directly from a digital model, without traditional formwork or large manual labour inputs.
How the Process Works
The most commercially widespread method is extrusion-based concrete printing (EBP). A gantry-mounted or robotic-arm printer moves over the build area following a computer-generated toolpath derived from a BIM or CAD model. A specialised concrete mix — engineered for printability (correct rheology so it holds shape immediately after deposition) and structural performance — is pumped through a nozzle and deposited in layers typically 15–50 mm thick and 40–100 mm wide.
Each layer bonds to the one below through a combination of hydration chemistry and physical interlocking. When the mortar is correctly formulated and the print timing is controlled precisely, the resulting wall sections achieve compressive strengths of 25–50 MPa — comparable to standard structural concrete (IS 456: M25–M40 grade).

The Three Main Technologies
| Technology | How It Works | Material | Best Application | Example System |
|---|---|---|---|---|
| Extrusion-Based (EBP) | Nozzle extrudes concrete mix layer by layer | Cementitious mortar, geopolymers | Walls, columns, housing shells | ICON Vulcan, COBOD BOD2 |
| Binder Jetting (D-Shape) | Liquid binder selectively injected into powder bed | Sand + inorganic binder | Complex architectural forms, furniture, façades | D-Shape (Enrico Dini) |
| Shotcrete / Spray Printing | Concrete pneumatically sprayed onto a form or scaffold | Standard shotcrete mixes | Curved surfaces, vaults, large-span elements | Contour Crafting (USC) |
Material Note
The printable concrete mix is fundamentally different from poured concrete. It requires zero-slump (no sag) consistency immediately after extrusion while maintaining sufficient workability to extrude smoothly. This is achieved through accelerator admixtures, silica fume, and carefully controlled water-to-binder ratios. Aggregate size is limited (typically under 4 mm) to prevent nozzle blockage. Getting the mix right for a specific project and climate is often the most technically demanding part of the work.
Reinforcement: The Unresolved Challenge
One of the most frequently glossed-over limitations in popular coverage of construction 3D printing is reinforcement. Standard horizontal and vertical rebar cannot simply be printed — it must be manually placed between printed layers or as post-tensioning after printing. This is one of the primary reasons fully printed load-bearing structures above 2–3 storeys remain technically and code-compliance challenging today. Several companies are actively developing automated reinforcement integration (steel fibre addition to print mix, printed rebar systems), but this remains a frontier problem as of 2026.
Market Size & Growth (2023–2035)
The construction 3D printing market is growing rapidly, but its exact size depends on what you count. Analyst reports vary considerably depending on whether they include only hardware (the printers), or the full supply chain: hardware, printable materials, software, project execution services, and maintenance. The figures below represent the most defensible middle-ground estimates based on cross-referenced industry analysis.
3D Printing Construction Market Growth (2023–2035)
The global 3D printing construction market is experiencing rapid expansion, driven by automation, cost efficiency, and growing demand for faster building technologies.
📌 Values are based on aggregated industry estimates and may vary depending on market scope and reporting methodology.
A Note on Market Projections
You’ll find some analyst reports claiming much higher figures — including $1 trillion+ by 2040. Treat such numbers with appropriate scepticism. The 2035 range of $60–100B assumes continued regulatory progress, mainstream adoption in affordable housing, and successful scaling of multi-storey printing. These are achievable but not guaranteed. Conservative scenarios place the 2035 market at $30–40B, which is still an extraordinary growth story.
Growth by Region
| Region | 2026 Market Share | Key Driver | Notable Activity |
|---|---|---|---|
| North America | ~30–35% | Defence contracts, affordable housing programs | US Army, ICON, project Wolf Ranch |
| Europe | ~28–32% | Sustainability regulations, social housing | COBOD (DK), PERI Group (DE), CyBe (NL) |
| Middle East | ~12–15% | Government vision programs, prestige projects | Dubai Municipality 3D printing mandate |
| Asia Pacific | ~15–18% | Mass housing demand, rapid urbanisation | China (WinSun), India (emerging), Japan |
| Rest of World | ~8–10% | Disaster relief, remote-area construction | UNHCR pilots, Africa rural housing |
Dubai’s government mandate — that 25% of all new buildings must incorporate 3D printing by 2030 — is arguably the single most consequential policy decision in this market. It is the first government-level commitment at that scale, and it is forcing the entire regional supply chain to mature rapidly.
Key Market Drivers — Why Growth Is This Fast
Labour Crisis
The construction industry is aging out faster than it can recruit. In the US, 41% of the current workforce will retire by 2031. 3D printing directly replaces the most labour-intensive tasks.
Cost Pressure
Global construction costs rose 30–40% between 2020 and 2024 due to supply chain disruptions, energy costs, and labour inflation. Automation is no longer a nice-to-have.
Sustainability Mandates
Construction accounts for ~11% of global CO₂ emissions (embodied carbon). Printing uses 30–60% less material than traditional formwork-poured construction, directly reducing embodied carbon.
Design Freedom
Curved walls, organic forms, and complex geometries that are prohibitively expensive with traditional formwork are no more expensive to print than a straight wall. This creates new architectural possibilities.
Defence & Emergency
Military and disaster-response applications require rapid field construction without supply chain dependency. 3D printing of barracks, shelters, and infrastructure using local materials is a strategic priority in multiple countries.
Latest Trends Shaping the Market (2025–2026)
AI-Driven Path Optimisation and Adaptive Printing
The next generation of construction printers is no longer just following a fixed toolpath. AI-integrated systems can now adapt in real time to variables like temperature, humidity, mix consistency, and substrate condition. If a layer is detected as slightly too wet before the next layer is deposited, the system pauses automatically rather than creating a weak bond plane. This level of process intelligence was a research concept in 2022 — it’s being field-deployed in 2025–2026 on projects in Europe and North America.
Multi-Material Printing
Early systems printed a single cementitious mix for the entire structure. Current systems are being developed to print multiple materials in the same pass — structural dense concrete on the outer and inner skins of a cavity wall, with a lower-density insulating mix in the core. This directly improves thermal performance without the separate installation step of insulation boards.
Geopolymer and Low-Carbon Binders
Portland cement production accounts for roughly 8% of global CO₂ emissions. The construction 3D printing sector is at the forefront of adopting alternative binders: fly ash-based geopolymers, slag-based mixes, and calcined clay cements. Several projects (notably WASP’s work in Italy with unfired earthen materials) have demonstrated structural printing with near-zero embodied carbon. This isn’t yet mainstream, but the regulatory pressure from the EU’s Fit for 55 programme is accelerating adoption considerably.
Large-Scale Infrastructure Applications
The market is moving beyond housing. In the Netherlands, a 3D printed concrete pedestrian bridge (designed by MX3D using wire-arc additive manufacturing for the steel version) opened to the public and demonstrated that printed infrastructure can meet public loading standards. Research into printed bridge abutments, culverts, retaining walls, and wastewater infrastructure is actively underway. These are significantly larger addressable markets than residential housing.
Space and Extraterrestrial Construction
NASA’s MMPACT (Moon to Mars Planetary Autonomous Construction Technology) programme — executed in partnership with ICON — is actively developing 3D printing systems designed to use lunar and Martian regolith (surface material) as the primary printing medium. The rationale is straightforward: carrying construction materials from Earth to the Moon costs approximately $1 million per kilogram. If you can print structures from local material, the economics of off-planet habitation change entirely. This research is simultaneously advancing Earth-based printing by pushing material science and robotic automation to new limits.
2025–2026 Notable Development
ICON, in partnership with the US Army Corps of Engineers, has demonstrated a fully printed two-storey structure and is actively working on multi-storey printing systems that incorporate automated reinforcement cage installation between printed layers. If this scaling challenge is solved — and there is real engineering momentum behind it — the addressable market expands dramatically overnight.
🇺🇸 United States — Residential
Real-World Case Studies — Projects That Changed the Conversation
100 Homes PrintedVulcan Printer System$450K–$600K Sale Price RangeLavacrete Mix UsedDeveloped in partnership with Lennar (a major US homebuilder), Wolf Ranch is currently the largest 3D printed neighbourhood in the world. Homes range from 1,500 to 2,000+ sq ft across single and two-storey layouts. ICON’s Vulcan printer handles the wall sections while conventional methods complete the roof, finishes, and MEP systems. The homes meet standard US building codes and are sold as market-rate properties — demonstrating that printed homes are not just for experimental pilots. The project proved that 3D printing can operate within a mainstream homebuilder’s quality control framework.
🇺🇸 United States — Defence
US Army Barracks — Camp Swift, Texas (2023)
72-hour Print TimeICON Vulcan System~4,000 sq ft Building AreaArmy Corps PartnerThe US Army Corps of Engineers and ICON completed the first 3D printed barracks structure in North America at Camp Swift. The project was a critical proof of concept for military applications — demonstrating that field-deployable printing can produce habitable, structurally sound structures in a fraction of conventional construction time. The military’s interest is not primarily cost-driven; it is about speed of deployment and the potential to print forward operating bases using local materials in contested environments where supply chains are unreliable. Follow-on contracts for multi-building printed installations have been awarded.
🇦🇪 UAE — Government
Dubai’s Office of the Future & Subsequent Government Buildings (2016 onwards)
17 days Print Time2,700 sq ft Floor AreaWinSun Technology50% Labour ReductionThe Office of the Future in Dubai was the world’s first fully functional 3D printed government building. While the project dates to 2016, its significance lies in the policy trajectory it established. Dubai’s government subsequently mandated increasing percentages of 3D printed construction content across all new government buildings. By 2025, multiple government office annexes, security posts, and public amenity structures in Dubai have been printed. The programme has created a functioning supply chain for construction 3D printing in the region that is now being commercialised for private developers.
🇮🇹 Italy — Sustainable Materials
WASP’s TECLA Eco-Housing Module — Massa Lombarda (2021)
Sustainable 3D Printed Housing — Key Metrics
200 sq ft Per ModuleRaw Earth MaterialCrane WASP SystemNear-Zero Embodied CarbonWASP’s TECLA project is arguably the most significant proof of concept for truly sustainable construction 3D printing. Using locally sourced raw earth (natural clay and rice waste) as the primary print material, TECLA produced a structurally sound habitable module with near-zero embodied carbon. This is genuinely radical: not a concrete structure with a reduced cement content, but a printed earthen architecture that eliminates industrial binders entirely. The project has attracted significant attention from development organisations working in Sub-Saharan Africa, where local earthen materials are abundant and imported construction materials are prohibitively expensive.
🌍 East Africa — Affordable Housing
14Trees / Holcim Project — Malawi and Kenya (2022–2025)
High-Speed Construction System — Key Metrics
COBOD BOD2 System12 hours Print Time / HouseSub $10K Target CostHolcim Materials Partner14Trees (a joint venture between CDC Group and LafargeHolcim) has been executing one of the most impactful affordable housing programmes using 3D printing — targeting the lowest-income segment of the market in East Africa. Using COBOD’s BOD2 printer and Holcim-supplied printable concrete, a basic two-room structure can be printed in approximately 12 hours. The programme has expanded from a single pilot in Malawi to multiple sites across Kenya, with the goal of demonstrating a fully replicable model for developing-world affordable housing. The economic argument is powerful: where traditional masonry construction in these contexts costs $30,000–$60,000+ for a basic structure, the 3D printing model targets $10,000–$15,000.
🇮🇳 India — Affordable Housing & Public Infrastructure
14Trees / Holcim Project — Malawi and Kenya (2022–2025)
5 days Print Time600–1,000 sq ft Built AreaTvasta TechnologyIIT Madras OriginDeveloped by Tvasta Manufacturing Solutions (IIT Madras incubated), this project represents one of the earliest and most practical demonstrations of construction 3D printing in India. The team successfully delivered India’s first 3D printed house, followed by a fully functional post office building, marking a transition from experimental prototypes to usable public infrastructure.
Unlike many global projects focused on high-end or experimental builds, Tvasta’s approach is grounded in cost-effective housing and local material optimisation. The structures were printed using indigenous systems designed for Indian site conditions, with emphasis on reducing construction time, labour dependency, and material waste.
Major Companies Driving the Market in 2026
The construction 3D printing industry does not yet have a dominant global player — it is still a fragmented market of specialised technology providers, material companies, and construction contractors. Here are the companies with the most significant real-world track records.
ICON
🇺🇸 Austin, Texas, USA
Technology: Vulcan System + Lavacrete
The most commercially active construction printing company in North America. ICON’s Vulcan printer uses their proprietary Lavacrete mix and operates from a compact footprint for residential-scale projects. Beyond Wolf Ranch, ICON holds contracts with NASA (Project Olympus for lunar construction), the US Army, and multiple affordable housing developers. Their software (Exploration Architecture) handles the full pipeline from architectural design to print toolpath generation. Valuation reportedly exceeded $2B in their last funding round.
COBOD International
🇩🇰 Copenhagen, Denmark
Technology: BOD2 Gantry Printer
Europe’s most prolific construction printer manufacturer, with the BOD2 system deployed across 30+ countries. COBOD’s gantry architecture scales exceptionally well — systems can be configured to cover build volumes of up to 25 m × 60 m × 9 m. They have printed a villa in Saudi Arabia, a two-storey office in Germany, wind turbine bases, and multiple housing projects. Notable investors include PERI Group (Germany’s largest formwork manufacturer), which signals deep construction industry confidence in COBOD’s long-term position.
WASP (World’s Advanced Saving Project)
🇮🇹 Massa Lombarda, Italy
Technology: Crane WASP multi-arm system
WASP occupies a unique and philosophically distinct position in the market — they are explicitly focused on low-impact, earth-material printing for developing world contexts. The Crane WASP multi-arm system allows multiple print heads to work on the same structure simultaneously from a central mast, reducing print time without requiring a large gantry system. WASP’s focus on raw earth, natural fibres, and by-product aggregates makes them the leader in the sustainable-materials segment of construction printing.
Apis Cor
🇺🇸 US (Originally 🇷🇺 Russia)
Technology: Mobile Arm Printer
Europe’s most prolific construction printer manufacturer, with the BOD2 system deployed across 30+ countries. COBOD’s gantry architecture scales exceptionally well — systems can be configured to cover build volumes of up to 25 m × 60 m × 9 m. They have printed a villa in Saudi Arabia, a two-storey office in Germany, wind turbine bases, and multiple housing projects. Notable investors include PERI Group (Germany’s largest formwork manufacturer), which signals deep construction industry confidence in COBOD’s long-term position.
Industry Note — China’s WinSun : WinSun (now Yingchuang Building Technique) demonstrated early mass printing capability with their off-site printed concrete panel approach — famously printing 10 single-storey structures in 24 hours in 2014. Their methodology uses large printed concrete panels fabricated in a factory and assembled on site. WinSun remains a major player in China’s market, though their technology is more panel-prefabrication than true on-site continuous printing. This distinction matters for performance comparison.
Advantages of Construction 3D Printing — Real Numbers, Not Marketing
Advantages
- Speed: Printed wall structures 3–5× faster than traditional masonry or formwork. A simple house shell: 24–72 hours of print time (excluding foundation, roofing, MEP).
- Material efficiency: Printing deposits only what is needed — no formwork waste, 30–60% less material consumption vs. traditional formwork-poured walls.
- Labour reduction: The 3 or 4 workers needed to operate a printing system replace a masonry crew of 15–25 for wall construction. This is where the 40–70% labour cost reduction comes from.
- Geometric freedom: Curved walls, complex cross-sections, integrated service channels, and organic forms cost the same to print as straight walls — unlike traditional construction where geometric complexity multiplies labour and formwork cost.
- Precision and consistency: Tolerances of ±5–10 mm are achievable — comparable to skilled masonry, with zero human variation between units in a large project.
- Reduced site hazard: Automated printing eliminates the need for workers to be in the active construction zone during wall erection — a genuine safety benefit.
- Scalability of design: The same BIM model can produce identical structures at multiple sites simultaneously — critical for large housing programmes.
Limitations
- High capital cost: A professional construction printing system costs $250,000–$1.5M+ depending on scale. Viability requires high utilisation across multiple projects.
- Reinforcement complexity: Steel reinforcement cannot be printed — it must be manually placed, limiting the technology’s advantage in highly reinforced structures.
- Material limitations: Aggregate size restricted to ~4 mm; standard high-strength concretes with 20 mm aggregate cannot be used. Specialist printable mixes are required.
- Operator skill gap: Printing systems require engineers with cross-disciplinary knowledge of robotics, concrete technology, and BIM software — currently a very scarce skill set.
- Building code challenges: Most national building codes (including IS 456 in India, ACI 318 in the US) were not written for printed concrete. Code compliance requires expensive third-party testing and special approval processes.
- Weather sensitivity: Freshly printed layers are vulnerable to wind, rain, and temperature extremes during and immediately after printing — requiring weather management protocols.
- Not a complete building system: Foundation, roofing, windows, doors, and MEP still require conventional construction — reducing the total project time saving to typically 20–40%, not 70%.
Challenges & Limitations — What’s Actually Slowing Adoption
The Code Compliance Bottleneck
This is the most underappreciated barrier in the industry. In the United States, the International Building Code (IBC) and ACI 318 do not have a defined pathway for printed concrete structural elements. Every project that uses 3D printed load-bearing walls currently requires an Alternative Materials and Methods (AMMR) approval — a lengthy, expensive, project-specific process. The same situation applies in India (Bureau of Indian Standards), the EU (EN Eurocodes), and most other major markets.
The US is making the most progress: the American Concrete Institute published its first printed concrete guide specification (ACI 562) in preliminary form, and ASTM International is developing standards specifically for additive-manufactured concrete. But until code bodies issue clear, standardised acceptance criteria, every large printed project requires expensive custom engineering justification — which erodes the cost advantage for smaller projects.
The Layer Bond Anisotropy Problem
Printed concrete is not isotropic — it is stronger in the direction parallel to print layers and weaker in tension perpendicular to them (across the layer interfaces). This is the fundamental structural challenge of extrusion-based printing. The weak planes between layers can become crack initiation sites under flexural or tensile loading. Admixture research, surface roughening between layers, and fibre reinforcement in the mix are all mitigating strategies, but engineers designing printed structures must explicitly account for this directionality — which adds design complexity.
Economic Viability Is Project-Specific
3D printing is not universally cheaper than traditional construction. It is most cost-effective in specific scenarios: simple building forms (walls, without complex junctions), high-volume repetitive projects (large housing developments), remote or difficult-access locations (where labour is expensive or scarce), and markets with very high labour costs. A custom residential project with complex roof geometry, multiple openings, and heavy MEP requirements may show minimal cost advantage over skilled traditional construction in a low-labour-cost market. Being clear-eyed about this is important for setting realistic expectations.
Future Outlook: 2030–2035
The Multi-Storey Breakthrough
The single most important development that would unlock the next phase of market growth is proven, code-compliant multi-storey printing. Currently, most commercially printed structures are single-storey. The technical challenges — reinforcement integration, wind load design for taller printed walls, layer interface shear strength under lateral loads — are understood and being actively solved. By 2028–2030, multi-storey printed apartment buildings (4–6 storeys) with integrated reinforcement systems are the industry’s next milestone. If achieved at scale, this opens up the urban housing market in a transformative way.
Integration with BIM and Digital Twins
The convergence of construction 3D printing with BIM (Building Information Modelling) and digital twin technology is already underway. In the near-term future, a printed building will have a full digital record of every layer deposited — material batch, print time, temperature, print speed, layer thickness — permanently associated with the structure’s BIM model. This is a quality assurance and liability record that no traditional construction method can match. Insurance and financing companies will recognise this, potentially offering preferential terms for printed buildings.
Autonomous On-Site Printing in Smart Cities
The longer-term vision — and one being actively worked on by research groups at MIT, TU Delft, ETH Zurich, and IIT — is fully autonomous construction: a site where a fleet of robotic printers, guided by a master BIM model and supervised remotely, constructs a building without sustained on-site human presence. This will require advances in site logistics, robotic coordination, and regulatory frameworks for unmanned construction sites. The technology components exist; the system integration is the 2030–2035 challenge.
Extraterrestrial Construction — The Long Game
NASA’s Artemis programme is targeting sustained lunar presence by the late 2020s. ICON’s Project Olympus is developing a Lunar Surface Manufacturing Facility — a printing system that can use lunar regolith as its primary material, bonded by a geopolymer process that works in the vacuum of space. The importance of this to Earth-based construction is not the space headlines — it’s the material science and autonomous robotics development that will cascade back into terrestrial applications. Research funded at this level, targeting these extremes, always produces broader advances.
Expert Insight — Where This Industry Is Actually Heading
Engineering Perspective
The construction industry typically takes 20–30 years to widely adopt a new technology after its initial demonstration. What’s unusual about construction 3D printing is that multiple, simultaneous pressures — the housing crisis, the labour shortage, sustainability legislation, and defence funding — are compressing that adoption timeline dramatically. We are not watching a technology waiting for its moment. We are watching a market that has found multiple viable use cases simultaneously and is scaling all of them at once.
For civil engineers entering the industry today, the competency that will differentiate professionals in 2030 is not concrete knowledge (everyone has that) — it’s the ability to work across the design-to-manufacture pipeline: BIM to toolpath, material specification to quality assurance, printed geometry to structural analysis. These skills don’t exist in most undergraduate programmes yet. The engineers who acquire them independently in the next three to four years will be extraordinarily well-positioned.
The most important thing to understand about 3D printing in construction is that it is not a replacement for engineering judgment — it is an amplifier of it. A badly designed printed building is just a badly designed building that was built faster. The technology raises the stakes for good engineering, not lowers them.
— TheCivilStudies Engineering Analysis Team, April 2026
Where This Is All Heading — A Final Assessment
The narrative around construction 3D printing has moved through three distinct phases over the past decade: novelty (“look, a printed house in 24 hours”), scepticism (“but can it really scale?”), and now — quiet inevitability. The projects are real. The contracts are real. The government mandates are real. The companies have moved past Series A funding rounds into full commercial deployment.
What comes next is not a question of whether 3D printing will be a significant part of the global construction industry — it will be. The question is which part: will it be limited to niche applications (affordable housing in remote markets, military deployments, prestige architectural projects) or will it become a mainstream construction delivery method for standard residential and commercial building?
The answer hinges almost entirely on two things: code standardisation and multi-storey capability. If those two barriers fall — and the engineering progress suggests they will, within this decade — then the $60–100B market projection for 2035 is not only plausible, it may be conservative. The construction industry has been waiting for a genuinely disruptive production technology for 150 years. This might genuinely be it.
Join the Civil Engineering Community
Connect with engineers, explore resources, and stay updated with practical civil engineering insights.
Engineering Outlook – Search Here 👁️
💬 Share Your Feedback
My Memberships
You do not have an active membership. Choose a membership level.