0 votes✓ 1 answer194 views
M25 cube test gave 16.2 N/mm² at 7 days — is that a problem?
Slab poured last week with M25 (OPC). The 7 day cubes averaged 16.2 N/mm². The site engineer says it will reach 25 at 28 days. What is the normal 7 day strength, and when should w…