Every hydrology question is a water account: what comes in as rain must go out as runoff, evaporation or seepage, or stay behind as storage. Irrigation questions then ask how to store that water and carry it to the field without losing it on the way.
The topics follow the order of the official GATE Civil Engineering syllabus under Water Resources Engineering. Flow in pipes and channels is covered separately in fluid mechanics and hydraulics, topic by topic. For the other subjects, see the GATE, ESE and SSC JE preparation guide.
What the syllabus asks
| Exam | Syllabus wording |
|---|---|
| GATE CE, Hydrology | Hydrologic cycle, precipitation, evaporation, evapo-transpiration, watershed, infiltration, unit hydrographs, hydrograph analysis, reservoir capacity, flood estimation and routing, surface run-off models, ground water hydrology: steady state well hydraulics and aquifers; application of Darcy’s law |
| GATE CE, Irrigation | Types of irrigation systems and methods; crop water requirements: duty, delta, evapo-transpiration; gravity dams and spillways; lined and unlined canals; design of weirs on permeable foundation; cross drainage structures |
| ESE Civil Paper II | Hydrological cycle, ground water hydrology, well hydrology and related data analysis; streams and their gauging; river morphology; flood, drought and their management; capacity of reservoirs. Water resources engineering: multipurpose uses of water, river basins, irrigation systems, water demand assessment, storages and their yields, waterlogging, canal and drainage design, gravity dams, falls, weirs, energy dissipators, spillways, cross drainage works, head-works, river training |
| SSC JE, Irrigation Engineering | Definition, necessity, benefits and ill effects of irrigation, types and methods of irrigation, hydrology: measurement of rainfall, run off coefficient, rain gauge, losses from precipitation; water requirement of crops, duty, delta and base period, kharif and rabi crops, command area; canals, canal lining, weirs and barrages, cross drainage works, flood control, river training |
1. Hydrologic cycle and precipitation
In simple words: Water evaporates from the sea, falls as rain, and returns to the sea over land and under it. For any area and period, rainfall equals runoff plus evaporation plus seepage to groundwater plus the change in storage. Rain is measured at points by rain gauges, and the point values are averaged to get the rainfall over a whole catchment.

Where you see it: The storage of a dam, the size of a storm drain and the waterway of a bridge all start from the rainfall record of the catchment.
| Quantity | Formula |
|---|---|
| Water budget | P − R − E − G = change in storage |
| Arithmetic mean rainfall | P = ΣPi / n |
| Thiessen polygon method | P = Σ(Pi Ai) / ΣAi |
| Isohyetal method | P = Σ(average of adjacent isohyets × area between them) / total area |
| Missing rainfall, normal ratio method | Px = (Nx / n) Σ(Pi / Ni) |
| Optimum number of rain gauges | N = (Cv / ε)² |
- The Symons gauge is the standard non-recording gauge in India. Recording gauges (tipping bucket, weighing and float types) also give the intensity of the rain.
- The arithmetic mean suits flat areas with evenly spaced gauges. The Thiessen method weights each gauge by the area nearest to it. The isohyetal method is the most accurate, especially in hills.
- A double mass curve checks whether the record of one station is consistent with its neighbours.
Example. Three rain gauges record 40 mm, 60 mm and 80 mm. Their Thiessen polygon areas are 20, 30 and 50 km². Find the mean rainfall over the catchment.
- P = (40 × 20 + 60 × 30 + 80 × 50) / (20 + 30 + 50) = 6600 / 100 = 66 mm.
- The simple average would be 60 mm. The Thiessen value is higher because the wettest gauge represents half the area.
2. Evaporation, evapotranspiration and infiltration
In simple words: Not all rain becomes runoff. Some evaporates, some is taken up and released by plants (transpiration), and some soaks into the soil (infiltration). Together these are the losses. What is left after the losses is the rainfall excess, which becomes direct runoff.
| Quantity | Formula or value |
|---|---|
| Lake evaporation | Pan coefficient × pan evaporation |
| Pan coefficient, Class A pan | About 0.7 |
| Horton’s infiltration equation | f = fc + (f0 − fc) e−kt |
| φ-index | The constant loss rate above which the volume of rainfall equals the volume of direct runoff |
| W-index | (P − R − initial losses) / duration of rainfall excess |
Infiltration is fastest at the start of a storm and falls to a steady value fc as the soil gets wet. Evapotranspiration is measured with a lysimeter or estimated by the Blaney-Criddle or Penman methods. It is the consumptive use of a crop.
Example. A storm gives 12 mm, 30 mm and 18 mm of rain in three successive hours and produces 30 mm of direct runoff. Find the φ-index.
- Total rain = 60 mm, so the loss is 60 − 30 = 30 mm.
- Try φ = 10 mm/h: the excess is (12 − 10) + (30 − 10) + (18 − 10) = 2 + 20 + 8 = 30 mm. It matches.
- φ-index = 10 mm/h. If any hour had less rain than φ, that hour would be left out and φ recalculated.
3. Runoff and the unit hydrograph
In simple words: A hydrograph is a graph of river flow against time. After a storm it rises to a peak and falls slowly. A unit hydrograph is the hydrograph produced by exactly 1 cm of rainfall excess falling evenly over the catchment in a given duration. Once you have it, the flood from any other storm is found by simple multiplication and addition.
Where you see it: Flood forecasting for a dam or a town: given the rain that has fallen in the catchment, the unit hydrograph tells the operators how high the river will rise and when.
| Quantity | Formula |
|---|---|
| Rational formula | Q = C i A / 360, in m³/s, with i in mm/h and A in hectares |
| Rational formula, area in km² | Q = 0.278 C i A |
| Direct runoff hydrograph | Unit hydrograph ordinate × rainfall excess in cm |
| Flood hydrograph | Direct runoff hydrograph + base flow |
| Volume under a unit hydrograph | 1 cm of depth over the catchment area |
| Equilibrium discharge of an S-curve | Q = 2.778 A / D, in m³/s, with A in km² and D in hours |
- The unit hydrograph assumes that runoff is proportional to rainfall excess (linearity) and that the catchment responds the same way every time (time invariance).
- An S-curve, made by adding unit hydrographs lagged by their own duration, is used to change a unit hydrograph from one duration to another.
- The rational formula is valid when the storm lasts at least as long as the time of concentration, and it suits small catchments.
Example. (a) Find the peak runoff from a 2 km² catchment with a runoff coefficient of 0.6 under rain of 50 mm/h. (b) A unit hydrograph has a peak of 40 m³/s. Find the flood peak for 3 cm of rainfall excess if the base flow is 5 m³/s.
- (a) Q = 0.278 × 0.6 × 50 × 2 = 16.7 m³/s.
- (b) Flood peak = 40 × 3 + 5 = 125 m³/s.
4. Flood estimation, flood routing and reservoir capacity
In simple words: A design flood is the largest flood a structure is built to pass safely. It is chosen by its return period: a 100-year flood has a 1 in 100 chance of being equalled or exceeded in any one year. Flood routing works out how a flood wave changes shape as it passes through a reservoir or down a river: the peak becomes lower and later.
| Quantity | Formula |
|---|---|
| Probability of exceedance | P = 1 / T |
| Risk of at least one exceedance in n years | R = 1 − (1 − 1/T)n |
| Plotting position (Weibull) | P = m / (N + 1) |
| Dickens’ formula | Q = C A3/4 |
| Ryves’ formula | Q = C A2/3 |
| Routing (continuity) equation | Inflow − outflow = rate of change of storage |
| Muskingum storage equation | S = K [x I + (1 − x) O] |
In the plotting position formula, m is the rank of the flood when the N recorded floods are arranged in descending order. In reservoir routing the storage depends only on the outflow, which is the Muskingum equation with x = 0. The storage needed in a reservoir to meet a steady demand is found from a mass curve of inflow (Rippl’s diagram). The capacity is divided into dead storage for silt, live storage for use and flood storage above the full reservoir level.
Example. A bridge is designed for a 50-year flood. What is the chance that this flood is exceeded at least once in the next 10 years?
- R = 1 − (1 − 1/50)10 = 1 − 0.9810 = 1 − 0.817 = 0.183.
- There is an 18.3% risk in 10 years, far more than the 2% chance in a single year.
5. Groundwater and well hydraulics
In simple words: Groundwater is stored in aquifers, layers of sand, gravel or fractured rock that hold and pass water. An unconfined aquifer has the water table as its top surface. A confined aquifer is trapped between two tight layers and is under pressure. When a well is pumped, the water level around it drops in the shape of an inverted cone.
Where you see it: The yield of a tube well for a village water supply, and the pumping needed to keep a deep basement excavation dry, are both found from these well formulas.
| Quantity | Formula |
|---|---|
| Darcy’s law | v = k i, and Q = k i A |
| Transmissivity | T = k b |
| Confined aquifer, steady flow (Thiem) | Q = 2π k b (h2 − h1) / ln(r2 / r1) |
| Unconfined aquifer, steady flow (Dupuit) | Q = π k (h2² − h1²) / ln(r2 / r1) |
| Porosity | Specific yield + specific retention |
| Specific capacity of a well | Discharge per unit drawdown |
h1 and h2 are the water levels, measured above the base of the aquifer, in two observation wells at distances r1 and r2 from the pumped well, and b is the thickness of a confined aquifer. Specific yield is the water that drains out under gravity; it is always less than the porosity. The difference between porosity and permeability is explained in porosity vs permeability.
Example. A well fully penetrates a confined aquifer 10 m thick with k = 20 m/day. Observation wells at 10 m and 100 m show a difference in water level of 2 m. Find the steady discharge.
- Q = 2π × 20 × 10 × 2 / ln(100 / 10) = 2513 / 2.303 = 1091 m³/day.
- That is about 12.6 litres per second.
6. Crop water requirement: duty, delta and base period
In simple words: Delta is the total depth of water a crop needs over its whole growing period. Duty is the area that a steady flow of one cubic metre per second can irrigate over that period. The base period is the number of days from the first watering to the last. The three are tied together by one formula.
| Quantity | Formula or value |
|---|---|
| Relation between duty and delta | Δ = 8.64 B / D, with Δ in metres, B in days and D in hectares per cumec |
| Kharif crops (sown June, harvested October) | Rice, maize, cotton, millets |
| Rabi crops (sown October, harvested March) | Wheat, gram, mustard, barley |
| Typical delta | Rice about 120 cm, wheat about 40 cm, sugarcane about 120 cm |
| Depth of water held in the root zone | dw = (γd / γw) × d × (field capacity − existing moisture content) |
- Duty is highest at the field and lowest at the head of the canal, because water is lost in every reach on the way.
- Gross command area is the total area a canal could serve. Culturable command area is the part of it that can be farmed. Intensity of irrigation is the percentage of the culturable area actually irrigated in a season.
- Methods of irrigation: surface methods (border, basin and furrow) are cheapest but waste the most water. Sprinkler irrigation suits uneven land and light soil. Drip irrigation delivers water to the root of each plant and has the highest efficiency, about 90%.
Example. A crop has a base period of 120 days and the duty of the canal water is 864 hectares per cumec. Find the delta.
- Δ = 8.64 B / D = 8.64 × 120 / 864 = 1.2 m.
- The crop needs a total depth of 120 cm of water, which is typical of rice.
7. Canals: lined and unlined
In simple words: An unlined canal in soil must flow at just the right speed. Too slow and the silt it carries settles and chokes it; too fast and it scours its own bed and banks. Kennedy and Lacey each gave rules for that non-silting, non-scouring velocity. Lining a canal with concrete or brick removes the problem of scour and cuts seepage losses.
| Quantity | Formula |
|---|---|
| Kennedy’s critical velocity | V0 = 0.55 m y0.64 |
| Lacey’s silt factor | f = 1.76 √d, with d the mean particle size in mm |
| Lacey’s velocity | V = (Q f² / 140)1/6 |
| Lacey’s wetted perimeter | P = 4.75 √Q |
| Lacey’s hydraulic mean depth | R = 2.5 V² / f |
| Lacey’s bed slope | S = f5/3 / (3340 Q1/6) |
| Lacey’s normal scour depth | R = 0.47 (Q / f)1/3 |
In Kennedy’s formula m is the critical velocity ratio (1 for the standard silt of the Upper Bari Doab canal) and y is the depth of flow. Kennedy’s method needs a trial slope; Lacey’s gives the slope directly. Seepage through an unlined canal causes waterlogging and salt build-up in the land beside it, which is one of the main reasons for lining.
Example. Design the velocity, wetted perimeter and hydraulic mean depth of a Lacey regime canal carrying 50 m³/s with a silt factor of 1.
- V = (50 × 1² / 140)1/6 = (0.357)1/6 = 0.84 m/s.
- P = 4.75 √50 = 33.6 m.
- R = 2.5 × 0.84² / 1 = 1.77 m. Check: area = 50 / 0.84 = 59.4 m², and 59.4 / 33.6 = 1.77 m.
8. Weirs on permeable foundations
In simple words: A weir or barrage built on sand holds water at a higher level upstream than downstream, so water seeps under its floor. That seepage can do two kinds of damage: it pushes up on the floor (uplift), and where it comes out at the downstream end it can carry soil away (piping). The floor is made long enough, thick enough and deep enough at its ends to prevent both.
| Theory | Rule |
|---|---|
| Bligh’s creep theory | Creep length L = C H; safe if the hydraulic gradient H / L is not more than 1 / C |
| Floor thickness for uplift (Bligh) | t = (4/3) h / (G − 1) |
| Lane’s weighted creep theory | Weighted creep length = sum of vertical creeps + one-third of the horizontal creeps |
| Khosla’s exit gradient | GE = (H / d) × 1 / (π √λ), where λ = [1 + √(1 + α²)] / 2 and α = b / d |
H is the head of water across the weir, h the uplift head at the point considered, G the specific gravity of the floor material, b the length of the floor and d the depth of the downstream cut-off. Bligh treated vertical and horizontal seepage paths as equally effective. Lane showed that vertical paths are three times as effective. Khosla showed that the danger is at the exit, and that a downstream cut-off is essential to keep the exit gradient safe.
9. Gravity dams, spillways and cross drainage works
In simple words: A gravity dam holds back water by its own weight. A spillway is the safety valve of a dam: it lets flood water pass without overtopping the dam. A cross drainage work is built where a canal has to cross a natural stream.
| Item | Key point |
|---|---|
| Forces on a gravity dam | Water pressure, uplift, self weight, silt pressure, wave pressure and earthquake forces |
| Ways a gravity dam can fail | Overturning, sliding, crushing of the material, and tension cracks |
| No tension condition | The resultant must pass through the middle third of the base |
| Base width of an elementary profile | B = H / √(G − c), where c is the uplift coefficient |
| Discharge over an ogee spillway | Q = C L H3/2 |
| Aqueduct | The canal passes over the stream, and the flood level of the stream is below the canal bed |
| Syphon aqueduct | The canal passes over the stream, but the stream flows under pressure below it |
| Super passage | The stream passes over the canal |
| Level crossing | Canal and stream meet at the same level and are controlled by gates |
Stability checks for a dam are worked out in gravity dam: design and stability analysis, and the main kinds of dam are compared in types of dams explained.
Common mistakes
- Mixing units in the rational formula. With the area in hectares divide by 360; with the area in km² multiply by 0.278.
- Multiplying a unit hydrograph by rainfall in mm instead of rainfall excess in cm.
- Forgetting to add the base flow after finding the direct runoff hydrograph.
- Including an hour in the φ-index calculation when its rainfall is less than φ.
- Using the confined aquifer formula for an unconfined aquifer. The unconfined formula has h² terms.
- Using delta in centimetres in Δ = 8.64 B / D. The formula gives metres.
Frequently asked questions
Which topics are most important for GATE?
Unit hydrograph and φ-index problems, average rainfall, return period and risk, well hydraulics, duty and delta, and Lacey’s canal design give most of the numerical questions. Weir theories and dam forces usually give short conceptual questions.
Is irrigation engineering important for SSC JE?
Yes. It is a named subject in the SSC JE syllabus. Questions are direct: definitions of duty, delta and base period, kharif and rabi crops, types of canals, canal lining, cross drainage works and river training.
What is the difference between duty and delta?
Delta is a depth of water: how much a crop needs in total. Duty is an area: how much land one cumec of water can irrigate over the base period. A crop with a large delta gives a small duty.
What is the difference between a weir and a barrage?
Both raise the water level of a river to feed a canal. A weir does it mainly with a solid raised crest, with small shutters on top. A barrage does it almost entirely with gates, which gives much better control of the flow and of silt.